Skip to content

UHBMIST

Toggle menu
  • Home
  • Cybathlon
  • News
  • Contact
  • Location

Joint Assembly

By JeffreyApril 1, 2016September 12, 2016Construction

The motors and gears are here and the housings are machined. Now for the actuator assembly. Here is a view of the actuators halfway assembled.

Joint Actuator Assembly
First joint midway through assembly with custom machined parts from Proto Labs.
Joint Actuator Assembly
Assembling the actuators with Maxon motors and Harmonic Drive gears.

 

actuatoraluminumassemblyjointmotors

Post navigation

Building Braces
University of Houston
Cullen College Engineering
UHBMIST Room S394
4722 Calhoun Rd, Houston, TX 77004
Get directions here

 

 

 

designed by shadows
© 2025 UHBMIST. Proudly powered by Sydney